How to Import Risks into the Kendis Risk Register

Follow this step-by-step guide to seamlessly upload, map, and validate your risks into the Kendis Risk Register from any spreadsheet.

Written by Kendis Team

Risk import allows you to bring structured risk data from spreadsheets or external systems into Kendis. Importing risks is available only from the Global Risk Register, not from individual boards.

This guide explains:

Importing risks via Paste Data or Upload File options.

Mapping file columns to Kendis fields.

Previewing and validating risk data.

Managing and exporting risks after import.

Before You Start

Import is available only under Risk Register (left navigation).

Supported formats: .xlsx, .xls, .csv (max 5MB).

Maximum 500 rows when pasting data.

The first row should contain column headers.

Step 1: Open the Target Risk Register

  • From the left navigation panel, click Risk Register.

  • Select the register where you want to import risks.

  • Inside the register, click the Download icon.

  • Select Import Risk.

The Import Risks window will open.

Step 2: Import Your Data

You can either paste structured data or upload a file.

Option A: Paste Data

Use this option when risks are already available in a spreadsheet or document.

  • Stay on the Paste Data tab.

  • Copy your risk table from Excel, Google Sheets, or another source.

  • Paste it into the input box.

  • Ensure “First row contains headers” is checked.

  • Click Next.

Kendis will process the pasted data and move to column mapping.

Option B: Upload an Excel or CSV File

Use this option when exporting risks from another system.

  • Switch to the Upload File tab.

  • Drag and drop your file or click to browse.

  • If you are unsure about formatting, click Download Sample Template.

  • Align your file with the sample template structure.

  • Upload the finalised file.

  • Click Next.

You will proceed to column mapping.

Step 3: Map Columns

Kendis fields must be mapped to your file columns.

For each required field:

  • Select the matching column from your file.

  • Review the sample data shown on the right.

  • Ensure all mandatory fields (marked with *) are mapped correctly.

  • Click Next.

Correct mapping ensures smooth validation and accurate import.

Step 4: Preview & Validate

Kendis validates your data before final import.

You will see:

Total Rows: 6

Valid Risks: 6

Invalid Risks: 0

Below this summary, a detailed Data Preview table displays:

Risk Title

Risk Description

Probability

Impact

Mitigation Actions

Status

Linked Items

Note: You may click Copy Table if you want to copy the validated data before importing.

  • After carefully reviewing your data, click Import.

  • A confirmation message appears: Import Completed!

  • Your risks are now added to the selected Risk Register.

Close the modal window.

Step 5: Manage Your Imported Risks

Once imported, risks appear in the register list.

From there, you can:

Edit individual risks.

Assign responsible owners.

Update status or dates.

Link risks to program boards or items.

Export Risk

You can export risks at any time.

Open Risk Register

Click the Download icon

Choose:

Export CSV

Export Excel

The export respects your current filters and visible data.